When installing domestic-plumbing and mechanical systems, all projects are afforded our best efforts to meet our clients' demands. Regardless of size — from a small tenant finish, to multi-story office buildings and 100,000+ sq ft commercial spaces — we ensure that even the most challenging of spaces have reliable, state-of-the-art, and efficient plumbing, heating, and cooling.
  • Denver County Jail: East Housing Unit

    Denver County Jail:
    East Housing Unit

    Contractor: FCI Constructors

    This multi-level addition to the existing inmate housing facility posed some unique challenges throughout the construction process, including an innovatively designed radiant cooling system and institutional-level security requirements. The building consists of seven stories containing both inmate housing and recreation areas, and required the installation of over twenty-four miles of plumbing- and mechanical-system piping. Making use of the complex's existing steam boilers, a basement-level heating-system mechanical room is installed in conjunction with a seventh-floor cooling-system mechanical room. Together, these two mechanical systems provide conditioned space via in-floor radiant tubing. As prime mechanical contractor, Lind's Plumbing assumed complete responsibility for overseeing progress and installation quality for all HVAC, BAS control, balancing, mechanical, insulation, and water treatment systems.

  • Powerhouse Energy Institute @ Colorado State University

    Powerhouse Energy Institute @ Colorado State University

    Contractor: The Neenan Company

    The CSU Engines Lab is globally recognized for energy research and education. Energy usage and conservation solutions have always been a driving force of Lind’s Plumbing’s ownership and employees, so it was an honor to receive the invitation to join the design and installation team for this LEED Platinum Certified project. This green-research complex expansion and renovation (currently under construction) is designed to measure and verify heating- and cooling-system energy usage. In order to assist this application of study, Lind’s Plumbing is contributing to the design and layout of 24.6 miles of radiant tubing — to be installed within the slabs of each floor and stairwell wall — in an effort to address variable factors affecting comfort from both the interior and exterior of the building.

  • Loveland Public Library Expansion and Remodel

    Loveland Public Library Expansion and Remodel

    Contractor: Dohn Construction

    Renovated and expanded for public use, the Loveland Library project allowed us to share our experience installing water based heating systems and domestic plumbing. Designed with desire to maximize usage of available space, the routing of these systems posed challenges. Teamwork with the contractor, owner, and the other skilled trades allowed us to present this project on time with expectations of design accomplished.

  • MeadowView Memory Care Village

    MeadowView Memory Care Village

    Contractor: Dohn Construction

    Our customers' efforts to meet demand for senior living have benefitted from Lind’s professional skills in both residential and commercial construction. The comfort, security, and dignity of senior residents are upheld amid our professionally installed plumbing and hydronic heating / cooling systems.

  • Greeley Medical Center

    Greeley Medical Center

    Coming soon...

  • Poudre Valley Medical Fitness at Marina Health Campus

    Poudre Valley Medical Fitness at Marina Health Campus

    Contractor: Dohn Construction

    The Poudre Valley Medical Fitness at Marina Health Campus is a 68,982 square foot ground up facility located in Windsor, CO. This three story building includes a two story wellness and aquatic center which houses a lap pool with trench drain. Just off the pool area are the male and female locker room groups. Located in the tenant areas are hospitality sinks, restroom groups and open tenant finish areas for future occupants.

  • Seven Generations

    Seven Generations

    Contractor: Dohn Construction

    Seven Generations is a 56,000 SF office building. It received its Platinum certification through numerous energy efficient items including, high efficient instantaneous water heater, 92% efficient boiler and low flow fixtures.

  • Salud Family Health Center

    Salud Family Health Center

    Contractor: Golden Triangle Construction, Inc.

    Salud Family Health was a ground up 39,243 square foot medical and dental clinic. Salud Family Health was a mechanical dream for companies like ours. This buildings mechancial scope was completed through a ground source geothermal system. The water used from the earth was then sent throughout the building through a two pipe system to Heat Pumps which converted the water into heat or cooling depending on the time of the year or the location of the building. This building is running more efficient than the typically built buildings lowering running costs year after year.

  • Boyd Lake Village Medical Office Building

    Boyd Lake Village Medical Office Building

    Contractor: Dohn Construction

    The Boyd Lake Medical Office Building totals 16,450 square feet with three different medical tenant finishes. This two story building houses Dr. Reynolds Oral, Facial Surgery of Loveland and Dr. Crane Orthodontics. Along with the standard restroom groups and exam office sinks this project also utilizes vacuum piping and medical gas.

  • Harmony One - Core & Shell

    Harmony One - Core & Shell

    Contractor: Brinkman Partners

    Harmony One is a 52,212 SF office building that holds not only the owner, Brinkman Partners, but many other occupants throughout the tenant areas. This project is LEED Accredited for the numerous environmentally friendly systems such as the waterless urinals, low flow fixtures, and an energy efficient mechanical system.

  • Markley Motors - Addition & Renovation

    Markley Motors - Addition & Renovation

    Contractor: Drahota

    The Markley Motors Project consisted of two phases, the first being a heated 6,400 square foot addition for customers to drop their vehicles off. The area consisted of in-floor radiant heat, keeping any ice off the floor during the winter months. The run-off from the vehicles was then ran into a long section of trench drain and treated with a Sand and Oil Separator cleaning the contents. The renovation totaling 10,000 square feet included completely renovated restroom and break room areas.

  • Palomino Mexican Restaurant

    Palomino Mexican Restaurant

    Contractor: Brinkman Partners

    The Palomino Mexican Restaurant is a 6,080 square foot ground up restaurant. The space consisted of a fully operational commercial kitchen allowing the restaurant to function properly, including gas to numerous appliances, hot and cold water piping to all required pieces of equipment and a 1,500 gallon grease interceptor.

  • Fresenius Medical Care Pavilion Dialysis Clinic

    Fresenius Medical Care Pavilion Dialysis Clinic

    Contractor: GH Phipps

    The FMC Pavilion Dialysis Clinic is a 24 chair dialysis center located at the Denver Pavilion Center. We provided waste and water connections for the chairs and the dialysis equipment. This tenant finish also has commercial Restrooms, exam sinks, and high demand for domestic hot water. This project sat over an underground parking facility which finished prior to the completion of the clinic making it challenging to work on the job while maintaining operation of the garage.