This 86,000 square foot expansion to the existing warehouse consisted of an additional 21 docks, (2)new cooler areas and (1) new freezer. We provided a floor drainage system, condensate drain standpipes for the (8) additional AC units and a trench drain system. The gas piping system was piped to numerous radiant tube heaters located in the docking areas. After moving the client into the new ground-up facility we remodeled the existing freezer area into
new cooler area with gas piping to new unit heaters.
CALL US TODAY
We’re always available to discuss your residential or industrial plumbing and heating needs. Give us a call today!